Dollar Bay, London

115 Apartments

Project Summary

The project involved a lot of fabrication.  Specifically designed and fabricated branches were created to ensure that the HDPE was in accordance with the architects plans.  All deliveries to this site were pre 10am due to the contractors needs and location of the build.

 

Products Supplied

  • HDPE
  • Soil and Waste
  • Copper
  • Flexible Plumbing